Dry Docking Schedule Around a Sale: Timing a Due Survey
Gradual Perfection15 de novembro de 2026maritime · dry-docking-schedule · special-survey · sale-and-delivery · yard-slot
When a vessel is approaching her special survey, the timing of a sale changes everything. A buyer who closes two months before the next SS inherits an immediate yard bill and a scramble for a slot. A buyer who plans the window well takes delivery with a clear runway and chooses the yard, the scope and the price on calm terms.
This note walks through how we sequence an acquisition against a due survey, so the dry docking falls where it should and not where the calendar forces it.
Read the survey position before you read the price
The first thing to establish on any candidate is where she sits in her class cycle. Two dates matter: next SS (the five-year special survey) and next DD (the intermediate dry docking). A guide price means little until you know how much yard time stands between you and those dates.
We ask three questions early:
- How many months remain to the next SS and the next DD, and whether either can be aligned into a single dock visit.
- What class records and outstanding conditions show, so the scope is known rather than assumed.
- Whether a BWTS retrofit or coating work is already due, since those drive both cost and docking days.
The answers set the shape of the whole timetable. A vessel with eighteen months of clear running gives the buyer room. A vessel with three months does not, and the price should reflect that.
Fit the delivery date to the yard slot
Our purchase process runs to timings we hold to: particulars and NDA in one to three days, inspection and a written recap over one to two weeks, the MoA in days, and delivery thirty to sixty days from agreed main terms. That delivery window is the hinge on which the docking turns.
Yard slots are booked ahead, and the better yards in a given region fill early. So we work the two calendars together rather than in sequence:
- Fix the realistic delivery range from the main terms, usually a span of weeks rather than a single day.
- Against that range, open slot enquiries at the yards that suit the vessel's size and the intended scope.
- Hold a preferred window with a short from-to span, so the slot survives small slips in the closing date.
- Keep the docking far enough after delivery that the buyer can run her, settle the crew and confirm the scope before she goes out of the water.
The aim is a delivery that lands the vessel with a known slot ahead of her, not a slot chosen in haste once she is already the buyer's responsibility.
Specify once, so every yard prices the same job
A docking planned around a sale carries one extra risk: the specification gets written in a hurry, and each yard prices a slightly different job. We write the specification line by line with the technical team, send one quotation package to selected yards, and compare every line item, docking day and payment term side by side. Repair contracts run on BIMCO RepairCon terms, and we attend the vessel through the docking to float-out.
Doing this before delivery, rather than after, means the buyer knows the real cost of the coming yard period while the price is still being negotiated. It also means the slot booking rests on a scope the yard has actually quoted.
One caution on class and flag timing. Where a survey falls close to a change of flag or ownership, the sequence of credits and conditions can be particular to the ship. For the specific case, we recommend confirming the position with the class society and, where tax or registration is involved, a lawyer or fiscal representative.
The right next step
If you are weighing a vessel with a survey due, the useful move is to map the delivery and the yard window together before you commit to terms. You can see how we run a purchase on how we work, send us a buying requirement so we match against the database, and open a slot enquiry on dry docking. The Sea Scan 1 file on our track record shows the acquire-refit-deliver sequence in practice.