Post-Purchase Dry Docking: Special Survey, Slot and Scope
Gradual Perfection24 November 2026maritime · dry-docking · special-survey · ship-sale-and-purchase · yard-slot
You have agreed terms on a vessel built in the 2000s, and her next special survey is not far off. Between signing the MoA and taking delivery, there is a quieter task that decides a good part of your first year of ownership: planning the first dry docking. Handled early, it protects your budget and your trading programme. Left late, it narrows your choice of yard and your room to negotiate.
This note sets out how we approach that first docking after delivery, and what we ask buyers to settle before the ship enters the yard.
Start while the sale is still open
The best time to begin docking planning is during the inspection and recap stage, not after delivery. By then you have seen the class records, and you know roughly what the surveyor will want and when the next SS and DD fall due.
A few things are worth fixing early:
- Confirm the exact due dates for the next special survey and the next dry docking from the class records, not from memory of the sale particulars.
- Note any outstanding class conditions or recommendations carried on the vessel.
- Check the status of the BWTS and any coating or steel renewal flagged at inspection.
- Decide, with your technical manager, whether the first docking combines the special survey or sits ahead of it.
These answers shape the window you can realistically book and the scope you will need to price.
Scope first, then the yard
We write the docking specification line by line with your technical team, so that every yard prices the same job. For tonnage near its special survey, the specification usually combines three strands: the class survey items, the owner's planned maintenance, and anything the pre-purchase inspection surfaced that you chose to carry rather than resolve before delivery.
Getting the scope settled before the tender matters for a newly acquired vessel in particular. You are still learning the ship. A clear, written specification keeps surprises inside the quoted price instead of appearing as extras once she is on blocks.
Once the specification is agreed, we send one quotation package to selected yards. We compare every line item, docking day and payment term side by side, and we negotiate docking days and payment terms. Repair contracts are placed on BIMCO RepairCon terms. We then stay with the vessel through the docking, hold the yard to the specification, and see her out to float-out.
Booking the slot
Yard slots for a defined window are finite, and the better yards fill early. When you request a docking slot from us, we work from a short set of details:
- Vessel type, DWT and LOA.
- Your preferred window, from and to.
- Preferred region: Mediterranean, Black Sea, Middle East, South East Asia, West Africa, or other.
- A scope summary.
With the special survey date fixed, we work backwards. We allow time for the tender and comparison, for the yard to confirm the slot, and for the voyage to the yard from the delivery region. A buyer taking delivery in one region and docking in another should build that passage into the window rather than treating the survey date as the only constraint.
We set the scope against the class due dates so that the docking clears the special survey cleanly, rather than leaving conditions to resolve at the next port.
One point on class and flag. Survey due dates and any outstanding conditions sit on the ship's class record, and the position can differ from what a sale summary shows. For the specific vessel, confirm the dates and conditions directly with the class society before you commit to a window.
The right next step
If you are closing on a vessel and want the first docking planned before she changes hands, send us the vessel particulars and your preferred window, and we will build the specification and tender the yards. You can see how we run a docking, from line-by-line specification to attendance at float-out, on our dry docking page, and read how we work across the file on how we work. When you are ready, reach the desk through contact.