BWTS Retrofit on Older Ships: Planning, Yard Time and Cost
Gradual Perfection4 November 2026maritime · bwts-retrofit · dry-dock-planning · compliance · ballast-water-treatment
If you own tonnage built before 2010, the Ballast Water Convention deadline is no longer a distant line on the calendar. The question is rarely whether to fit a system, but when, at which yard, and how to keep the installation from turning a routine docking into a long one. We coordinate dry dockings for owners, and the same pattern repeats: a BWTS retrofit succeeds or fails long before the ship reaches the yard.
This note sets out what the work actually demands, in the order it demands it.
Survey and engineering come first
A ballast water treatment system is not a bolt-on. It is a pumproom and piping project, and the engineering is where the real time lives.
The sequence we hold to runs roughly as follows:
- Technical survey of the ballast system. Pump capacity, existing piping, available space in the pumproom or engine room, and the electrical load the ship can carry. On older vessels, space is usually the binding constraint.
- System selection. The main choice is between ultraviolet and electrochlorination treatment. UV units draw more power but suit smaller ballast flows; electrochlorination suits larger flows but adds its own equipment and handling. The decision follows the ship's trade, ballast capacity and power margin, not a catalogue preference.
- Class approval of the installation design. Your class society reviews the arrangement, the piping modifications and the electrical integration. This is paperwork, but it is paperwork that gates the yard.
- Long-lead procurement. The treatment unit and its control gear are ordered against a delivery date. If the unit is not on the quay when the ship arrives, the docking waits for it.
We write the specification line by line with your technical team, so that every yard prices the same job. For a retrofit this matters more than usual, because vague scope on piping and cabling is where quotations drift apart and where change orders appear once the ship is already dry.
Yard days and what drives them
The treatment unit itself can often be landed and seated in a matter of days. The time is consumed by everything around it: cutting into existing ballast lines, running new piping, pulling cables through an occupied engine room, and commissioning.
The main drivers of yard time, in our experience, are these:
- Piping modifications. The more the new system has to be woven into old, corroded lines, the longer the job. On a pre-2010 hull the existing steel often needs attention once it is opened up.
- Cable routing and electrical load. Finding a path for new cabling, and confirming the generators can carry the added draw, can quietly extend the schedule.
- Commissioning and the operational test. The system must be proven to work, not merely installed. This step is frequently underestimated.
- Steel condition found on opening. Any retrofit on an older ship carries the risk of discovering more than the specification assumed.
The practical saving is to align the retrofit with a docking the ship already owes — a special survey or scheduled dry docking. The vessel is out of trade once, not twice, and the fixed costs of docking are shared across both scopes.
How we keep the cost honest
We send one quotation package to selected yards and compare every line item, docking day and payment term side by side. For a BWTS retrofit, we ask each yard to price the installation separately from the hull and survey work, so you can see what the system alone is adding and negotiate the docking days on that basis. Repair contracts run on BIMCO RepairCon terms, and we attend the vessel through the docking and hold the yard to the specification until float-out.
We do not quote a figure for a retrofit we have not scoped — the number depends entirely on the system chosen, the ship's condition and the yard region. What we offer is the method that makes the figure visible and defensible.
Classification approval, the convention's compliance dates for your specific vessel, and any flag-state particulars should be confirmed with your class society and, where the position is unclear, with a lawyer or technical adviser for that ship.
If you are planning a docking window and want the BWTS scope tendered properly alongside your survey work, tell us the vessel type, DWT, LOA and preferred window on our dry docking page. You can see how we run a file from specification to float-out in how we work, and our refit of a State-auction tug is set out in the Sea Scan 1 track record.